Frame turbine order books are full into the end of the decade. Interconnection runs five to seven years. The projects getting built are the ones that bridge: modular gas generation carrying load now, then converting to standby or stepping aside when the permanent source lands. Mesa Power Solutions builds that bridge, and in this session we give away the playbook we use with developers. The four long-lead items that actually set your energization date, in order, and why engine delivery is almost never the binding one. The five commercial structures available to you, what each costs, and why lease pricing carries a premium. Where EPC scope has to be divided before notice to proceed, because undefined interfaces are the most common source of schedule slip. We will show deployment timelines from operating microgrids, the layout and acreage math for a several-hundred-megawatt site, and how ultra-low emissions catalyst packages keep a project inside its permit instead of inside a PSD review. Bring your site constraints. We will work them in the room. Mesa manufactures at 220,000 square feet in Casper, Wyoming and 200,000 square feet in San Antonio, Texas, and runs live block-load and engine-failover demonstrations at the San Antonio plant for anyone who wants to see the equipment prove it before they buy it.